• Safety instructions
  • Approvals & Declaration of Conformity
  • Product Information
  • Scope of delivery
  • Accessories & spare parts
  • Assembly
  • Commissioning
  • Operation & use
  • Inspection & maintenance
  • Disassembly & disposal
  • Downloads
  • Service and support
  • To the homepage
    To the KEMPER website
The logo of Kemper
  • Deutschland | Deutsch
  • International | English
  • Danmark | Dansk
  • Nederland en België | Nederlands
  • Österreich | Deutsch
  • Schweiz | Deutsch
  • Schweiz | Français
  • Schweiz | Italiano
  • UK & Ireland | English

Inspection & maintenance


FK-5 PRO maintenance schedule

Checking the free drain

Checking the overflow

Checking the quarter turn stop valves

Function test of the pump

Reset the operating hours from the pump

Checking the waste water connection

Checking the casing

Checking the dirt trap

Checking the membrane expansion vessel

Checking time and date

Battery change

Download and read the log files

Function test of the overflow monitoring device (optional)

Function test of the solenoid valve from the tank cleaning set (optional)

Maintenance protocol

Overview

© Gebr. Kemper GmbH + Co. KG

Data privacy | Imprint

Powered by ©2025 codo